Get Ready for Your Bathroom Remodeling: A Practical Checklist
The best way to get ready for bathroom remodeling is to make most of your decisions before work starts, set up a backup plan for bathing and toilets, and protect the rest of your home from dust. Do those three things and the weeks of construction feel much calmer. This checklist walks you through what to do before demolition and while the crew is working, with notes for Chicago homes.
How Do You Get Ready for Bathroom Remodeling? Start With the Plan
Good preparation starts weeks before the first tile comes off the wall. Sit down with your contractor and agree on the scope in writing. A clear scope means fewer changes later, and changes in the middle of a job are the main reason projects run long.
Decide what stays and what goes
Walk through the room and make a list. Will the tub stay or become a shower? Is the toilet staying in the same spot? Do you want more storage, a bigger vanity or a better fan? Moving plumbing is possible, but it adds work, so decide early. If space is tight, read up on small bathroom remodeling ideas before you lock in a layout.
Ask what your permit requires
Many bathroom projects need a permit, especially when plumbing, electrical or walls change. In Chicago, the Department of Buildings handles permits. In the suburbs, it is your village or city building department. We check what your permit requires and handle the paperwork, but you should know that permit review and inspections are part of the schedule.
Check your building rules
If you live in a condo or a two-flat with a shared building, read your association rules now. Many condo boards limit work hours, ask for a certificate of insurance from the contractor, and want notice before water to the building is shut off. Some require the elevator to be padded or reserved. Getting approval late can push back your start date.
Choose Your Materials Before Demolition
Waiting on a vanity or a shower valve is one of the most common causes of delay. The fix is simple: pick and order your materials before the old bathroom comes out. A bathroom remodel materials list helps you make sure nothing is forgotten.
Here are the items to have chosen before work starts:
- Floor tile and wall or shower tile, plus grout color
- Vanity, countertop and sink
- Toilet
- Tub or shower base, and shower glass or curtain rod
- Faucets, shower valve and trim in one finish
- Lighting, mirror or medicine cabinet
- Exhaust fan
- Towel bars, hooks, toilet paper holder and grab bars if you want them
Order a little extra tile. Some pieces get cut or break, and a later batch may not match in color. Keep the leftover boxes for future repairs. When items arrive, open the boxes and check for damage right away, not on the day the installer needs them.
Plan on a few hidden fixes, too. In older Chicago bungalows and greystones, opening the walls often shows old galvanized supply pipes, cast-iron drains or a rotted subfloor near the toilet. These are not things anyone can see at the estimate. Set aside some room in your budget so a repair like this does not force you to cut something you really wanted.
How Will You Live Without a Bathroom?
If your home has only one bathroom, this is the most important part of your plan. Even with a second bathroom, it helps to think it through.
If you have a second bathroom
Move your daily items there before the crew arrives: toothbrushes, towels, medicine, hair tools and cleaning supplies. Expect a morning line if several people share it. Some families set a simple shower schedule so everyone gets out the door on time.
If it is your only bathroom
Talk to your contractor about keeping the toilet working as long as possible, or setting it back temporarily at the end of a work day when that is practical. Then line up places to shower. Options include:
- A gym or community center where you have a membership
- Family or friends who live nearby
- A short stay with relatives or a nearby rental during the messiest days
- A basement shower or laundry sink, if your home has one
Many people choose to get away during demolition and the first rough-in days. That is when noise and dust are at their worst. You can still check in by phone and look at photos of the progress.
Protect Your Home, Kids and Pets
A good crew protects your home, but a little prep on your side makes their job easier and keeps your things safe.
- Clear the path. Move rugs, furniture, photos and breakables from the hallway between the door and the bathroom.
- Empty nearby closets. Linen closets next to the bathroom collect dust fast. Bag or move what is inside.
- Plan for dust. Ask how the work area will be sealed off and how floors will be covered. Close doors to other rooms and change your furnace filter after the dusty phase.
- Keep pets away. Doors will open and close all day. A closed room or a stay with a friend keeps pets safe and calm.
- Talk to your kids. Explain which areas are off limits and why. Tools and open walls are not safe places to explore.
- Tell the neighbors. In a condo or two-flat, a quick note about noise and work hours goes a long way.
If your home was built before 1978, the old paint may contain lead. Your contractor should follow lead-safe work practices. HQ Carpentry is EPA Lead-Safe certified, so we set up containment and clean up the right way.
In winter, ask where debris will go and how the crew will keep snow and salt off your floors.
Set a Realistic Schedule and Stay in Touch
Ask your contractor for a written timeline before the job starts, and add some cushion to it in your own plans. Delays happen for reasons no one can fully control: a backordered part, a permit inspection date, or a hidden leak behind the wall. For a closer look at how long each phase takes, see our guide to a realistic bathroom remodel timeline.
Most bathroom remodels follow the same order:
- Protection and demolition
- Repairs to framing, subfloor or pipes found behind the walls
- Plumbing and electrical rough-in, then inspection if the permit requires it
- Waterproofing, backer board and drywall
- Tile, then grout and sealing
- Vanity, toilet, fixtures, glass, lighting and paint
- Final inspection, cleanup and walkthrough
Agree on how you will communicate. Pick one person on your side and one on the contractor’s side. Decide whether you prefer texts, calls or a short daily update. Ask to be told right away about any problem found behind the walls, with photos and options, so you can decide quickly. Quick decisions keep the crew moving.
At the end, do a walkthrough together. Run every faucet, flush the toilet, turn on the fan and lights, and look at the tile and caulk lines in good light. Ask about care for your new grout and fixtures, and keep the paperwork for your 1-year workmanship warranty.
Frequently Asked Questions
How far ahead should I start getting ready for bathroom remodeling?
Start as soon as you have a contractor and a signed scope. Use that time to choose and order materials, request any condo or HOA approvals, and let the permit process run. Lead times for vanities, tile and shower glass vary, so ordering early protects your start date. A few days before work begins, clear the hallway, empty nearby closets and move your daily items to another bathroom. Starting early means demolition day is not the day you are still choosing grout.
Can I stay in my home during a bathroom remodel?
Yes, most homeowners do. The work area is sealed off, floors are covered, and the crew cleans up at the end of the day. The hardest part is the first few days of demolition, when noise and dust are highest. If you have only one bathroom, plan where you will shower and ask your contractor how long the toilet will be out of service. Some people stay with family for a few nights during the loudest phase, then come back once rough-in starts.
What should I remove from the bathroom before work starts?
Take out everything that is not attached: towels, rugs, toiletries, medicine, shower curtains, wall art and anything stored under the sink. Empty the medicine cabinet and any linen closet next to the bathroom. Also clear the hallway path from your door to the bathroom so materials can move in safely. If there are fixtures you want to keep, such as an old mirror or a light, tell the crew before demolition so they can remove them carefully and set them aside.
What causes delays in a bathroom remodel?
The most common causes are late material decisions, backordered items, changes in the middle of the job, permit review and inspection dates, and problems hidden behind walls, like old galvanized pipes or a soft subfloor. You can control the first three by choosing everything early and sticking to the plan. Hidden problems cannot be predicted, but a good contractor will show you what they found, explain the options and give you a clear price before doing the extra work.
Ready to plan your project? Learn more about our bathroom remodeling services in Chicago, or request a free in-home estimate. We come to your home, look at the space, talk through your plans and give you a fixed written quote.