Project Gallery  /  Basement and Upstairs Remodel

Basement and Upstairs Remodel in Chicago

A remodel on two levels in the Chicago area: finished bathrooms, a new kitchen and hardwood floors upstairs, and a basement that is still taking shape.

The upstairs is finished, and the basement is still in progress. The photos of the basement show the work as it stands today. We will add the finished basement photos when the job is done.

What You See in These Photos

Upstairs, two bathrooms, a kitchen and a living area are finished. Downstairs, the basement is still being built, and several trades work in the same space. The basement photos were taken in the middle of that process, with paint on the walls, cabinets in place and the floor protected.

If you are planning something similar, read about our basement remodeling and bathroom remodeling services, or see how we manage a job as your general contractor.

Project at a glance
Type
Home remodel on two levels
Status
Upstairs finished, basement in progress
Location
Chicago area

Upstairs: Two Bathrooms

The first bathroom has dark gray subway tile on the shower walls, a hexagon mosaic floor, brass fixtures and a pedestal sink. A built-in niche and a mosaic tile surround around the window finish the shower. The second bathroom uses large-format tile with brown veining on the shower walls. Planning a bathroom? See our bathroom remodeling page.

Bathroom with a walk-in shower in dark gray subway tile, a hexagon mosaic floor, a brass shower head, an arched tile panel with a mosaic niche, a pedestal sink and a brass vanity light
Dark gray subway tile, a hexagon mosaic shower floor, brass fixtures and a pedestal sink.
Walk-in shower with dark gray subway tile walls, a brass shower head, a frosted window with a mosaic tile surround and a hexagon tile floor
The shower wall runs to a frosted window with a mosaic tile surround.
Built-in shower niche with mosaic tile lining next to a frosted window on a dark gray subway tile wall
A built-in niche gives the shower storage.
Shower with large-format gray tile with brown veining, a round brass shower head, a hexagon tile floor, a toilet and a wood door
A second bathroom with large-format veined tile on the shower walls.

Upstairs: The Kitchen

The kitchen has dark wood-grain flat-panel cabinets, a light countertop with a peninsula, brass and glass pendant lights and stainless steel appliances. The sink sits under two windows. Read more about our kitchen remodeling.

Kitchen with dark wood-grain flat-panel cabinets, two brass and glass pendant lights, a stainless steel refrigerator and gas range, a light countertop peninsula and a wood floor
Wood-grain cabinets, brass pendants and stainless appliances.
L-shaped kitchen with dark wood-grain cabinets, a light countertop, a sink under two windows, pendant lights and a light wood floor
The kitchen corner has a sink under two windows.
Wide view of a kitchen with dark wood-grain cabinets, a stainless steel refrigerator, a gas range, a peninsula with a sink and a doorway to the next room
A wide view of the kitchen, from the refrigerator to the peninsula.
Kitchen with a stainless steel gas range, a microwave above it, dark wood-grain cabinets, a dishwasher and a window with a light countertop
The range wall with a microwave, cabinets and a window.

Upstairs: Hardwood Floors

The living area keeps its hardwood floor and wood window trim. See our flooring services.

Living room with a hardwood floor in the sun, wood-trimmed windows, a ceiling fan and an open doorway
The hardwood floor and the wood window trim.

The Rooms

The rooms have new white drywall, windows and a glossy floor finish. Some of the walls are angled.

Basement room with angled walls, new white drywall and a glossy amber-brown floor, protected with paper at the edge
New drywall and a finished floor, with paper protecting the edges while other trades work.
View through a basement doorway into a room with new walls, a finished floor and two windows
View into a finished room with two windows.
Corner of a basement room with new white drywall, a window and a finished amber-brown floor
New drywall, a window and the finished floor in a corner of the basement.

Walls and Floor

The walls have new drywall, and the doorways are framed, including one arched opening. The floor finish is covered with paper and taped at the edges, so it stays clean while the other trades finish their work. That protection comes off near the end of the job.

Basement room with new white drywall, an arched doorway and a wood door in the background
A room with an arched doorway, drywall finished and ready for the final stages.
Basement hallway with new drywall, framed doorways and protective paper covering the floor
Hallway with new drywall and framed doorways.
Long basement hallway with new white walls and floor covered by protective paper and blue tape
Hallway with new walls; the floor is protected for the rest of the build.
Glossy amber-brown basement floor finish next to a taped edge with protective paper
The finished floor is covered with paper and taped at the edges before the remaining work.

Plumbing and the Shower

Water supply lines and a drain run through the open ceiling during rough-in. This is a standard stage, and the ceiling is closed only after the work is done. The shower stall is lined with cement board, and tile work has started on the floor. Both are standard stages of a basement bathroom.

Copper water supply lines and a drain pipe in the open ceiling of a basement before it is closed up
Copper supply lines in the ceiling during rough-in, before the ceiling is closed.
Basement shower stall lined with cement board, a shower head and mosaic floor tile being installed
The shower stall is lined with cement board, and the floor tile has been started.

Shower Tile

Tile work on the shower walls has begun. Large-format tile slabs are set with leveling clips, which hold neighboring pieces flat while the setting material cures. The built-in niche is coated first, and the tile is cut around it. These photos show the work as it stands today.

Basement shower stall with large veined gray tile slabs set on the wall with red leveling clips, a work light and a platform
Large-format tile slabs are set on the shower wall with leveling clips to keep the surface flat.
Built-in shower niche with a green coating next to large veined gray tile slabs set with leveling clips
The built-in niche is coated before tile; the wall tile is set up to its edge.
Wide view of a basement bathroom with veined gray tile slabs on the shower wall, a work platform and a frosted window
View of the shower wall from the doorway, with the window and the protected floor.

Basement: Paint, Cabinets and Doors

The basement work continues. The walls are painted, light wood cabinets are installed, the closet has its folding doors and the floor and windows are covered while the remaining work goes on.

Basement room with navy blue walls, new light wood cabinets, a countertop covered for protection and windows covered with paper
Navy paint is on the walls and the cabinets are in, with the countertop covered while work continues.
Tall light wood cabinet unit with an open section in a basement room with a protected floor
A tall cabinet unit is installed in the basement.
Basement room with a navy blue wall, an arched doorway with a wood door, a ceiling soffit and tools on a protected floor
An arched doorway and a navy wall in the basement.
Basement hallway with painted sage green walls, a wood door and the floor covered with protective paper and blue tape
The hallway has paint on the walls, with the floor protected.
Basement closet with arched wood folding doors on a sage green wall above a protected floor
Folding closet doors are hung in the basement.
Basement room with painted sage green walls, two windows covered with paper and taped, and a stained floor
A painted basement room with the windows covered during the work.

Planning a Basement Project?

HQ Carpentry is licensed and insured. We come to your home, walk through the space with you and give you a fixed written quote after the visit. Our work carries a 1-year workmanship warranty. Call us at (773) 968-3606 or send the form at the top of this page. We are available Monday through Friday 7 AM to 7 PM, Saturday 9 AM to 5 PM, and Sunday 9 AM to 3 PM.

Serving Chicago and the suburbs · Licensed & Insured

Free on-site estimate

We come to your home. No charge, no obligation.