A remodel on two levels in the Chicago area: finished bathrooms, a new kitchen and hardwood floors upstairs, and a basement that is still taking shape.
The upstairs is finished, and the basement is still in progress. The photos of the basement show the work as it stands today. We will add the finished basement photos when the job is done.
Upstairs, two bathrooms, a kitchen and a living area are finished. Downstairs, the basement is still being built, and several trades work in the same space. The basement photos were taken in the middle of that process, with paint on the walls, cabinets in place and the floor protected.
If you are planning something similar, read about our basement remodeling and bathroom remodeling services, or see how we manage a job as your general contractor.
The first bathroom has dark gray subway tile on the shower walls, a hexagon mosaic floor, brass fixtures and a pedestal sink. A built-in niche and a mosaic tile surround around the window finish the shower. The second bathroom uses large-format tile with brown veining on the shower walls. Planning a bathroom? See our bathroom remodeling page.
The kitchen has dark wood-grain flat-panel cabinets, a light countertop with a peninsula, brass and glass pendant lights and stainless steel appliances. The sink sits under two windows. Read more about our kitchen remodeling.
The living area keeps its hardwood floor and wood window trim. See our flooring services.
The rooms have new white drywall, windows and a glossy floor finish. Some of the walls are angled.
The walls have new drywall, and the doorways are framed, including one arched opening. The floor finish is covered with paper and taped at the edges, so it stays clean while the other trades finish their work. That protection comes off near the end of the job.
Water supply lines and a drain run through the open ceiling during rough-in. This is a standard stage, and the ceiling is closed only after the work is done. The shower stall is lined with cement board, and tile work has started on the floor. Both are standard stages of a basement bathroom.
Tile work on the shower walls has begun. Large-format tile slabs are set with leveling clips, which hold neighboring pieces flat while the setting material cures. The built-in niche is coated first, and the tile is cut around it. These photos show the work as it stands today.
The basement work continues. The walls are painted, light wood cabinets are installed, the closet has its folding doors and the floor and windows are covered while the remaining work goes on.
HQ Carpentry is licensed and insured. We come to your home, walk through the space with you and give you a fixed written quote after the visit. Our work carries a 1-year workmanship warranty. Call us at (773) 968-3606 or send the form at the top of this page. We are available Monday through Friday 7 AM to 7 PM, Saturday 9 AM to 5 PM, and Sunday 9 AM to 3 PM.
Serving Chicago and the suburbs · Licensed & Insured
We come to your home. No charge, no obligation.